Lifting London 2012's bridges
Premium Content
07 October 2009
The huge land bridge that forms the main London 2012 Olympics鈥� 鈥淕ateway to the Games鈥� is now taking shape. The 250 m-long, 40 m-wide bridge, which is fabricated using 1700 tonnes of steel, will form the roof of the Aquatics Centre training pool and be the main pedestrian access into the Olympic Park. It will carry an estimated 200000 people every day during the Games. Construction work is now underway on 21 of 30 new bridges that will cross waterways, roads and rivers to create a 鈥渃onnected, open and accessible鈥� Olympic Park.
必赢体育
STAY CONNECTED




Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.
CONNECT WITH THE TEAM


Neil Gerrard
Senior Editor, Editorial, UK - Wadhurst
Tel: +44 (0) 7355 092 771
E-mail: [email protected]

