All Olympics Articles
Premium Content
Following on from International Construction鈥檚 recent article on why megaprojects go wrong and the ingredients for success, this week we examine some of the biggest budget overruns on projects.
The engineering challenges of Grand Paris Express, Europe鈥檚 largest transport infrastructure project
Premium Content
Soci茅t茅 du Grand Paris boss, Bernard Cathelain, tells 必赢体育鈥檚 Lucy Barnard about the engineering challenges behind Europe鈥檚 largest transport infrastructure project
Premium Content
SOM architects win competition to design site with sustainability and future use at its heart
Premium Content
The IOC headquarters in Switzerland, is one of the most sustainable buildings in the world
Premium Content
The April issue of International Construction will feature a report on construction of the US$ 5 billion Olympic Complex in Turkmenistan鈥檚 capital Ashgabat by Polimeks. Read on to see exclusive pictures form the scheme.
Premium Content
The 80000-seater flagship venue for the 2012 London Olympics has been completed three months early and -2% under budget.
Premium Content
The last piece of turf for the London 2012 Olympic Stadium's field of play has been laid in a special ceremony marking completion of construction on the flagship venue.
Premium Content
A new webcam unveiled by the ODA shows work underway to install the timber cycling track of the London 2012 Velodrome.
Premium Content
New images show water beginning to flow at the new London 2012 white water canoe centre.
Premium Content
Indian anti-corruption watchdog accuses builders of inflated prices and poor quality
Premium Content
Russian deputy prime minister Dmitry Kozak confirmed during a visit to the 2014 Winter Olympic Games venue of Sochi that preparations are fully on-track.
Premium Content
New images of the London 2012 Velodrome show the huge roof now covered with the timber ceiling in place.
Premium Content
Work has begun on the London 2012 Olympic Stadium's "field of play" on the second anniversary of the start of construction on the Stadium.
Premium Content
New video footage shows construction and testing of the London 2012 Aquatics Centre.
Premium Content
New aerial images show the 2012 Olympic Stadium's lighting towers lifted into place 60 m above the field of play
Premium Content
A UNEP report criticises Russia for failing to monitor the effects of several construction projects for the 2014 Winter Olympics on the region's wildlife.
Premium Content
A new bridge has been lifted into place at the Eton College Rowing Centre at Dorney Lake near Windsor ahead of the London 2012 Olympic Games.