Snow problem: how contractors can prepare for winter in Northern Hemisphere

Winter is officially just days away in the Northern Hemisphere, and the most northerly portion can expect another season of lowered temperatures and a mix of oscillating extreme dry and moist air for the coming months. So, what can contractors and builders do to prepare?

A tower crane in the snow (Image: Adobe Stock) A tower crane surrounded by winter terrain. (Image: Adobe Stock)

In the US, the National Oceanic and Atmospheric Administration (NOAA) is anticipating above-average snowfall around the northern and Great Lakes regions of the country.

The European Centre for Medium-Range Weather Forecasts (ECMWF) remains a mixed bag, with some models sensing higher than average temperatures across the continent, but particularly in Scandinavia. The ECMWF expects more moisture than average for northern countries.

Heavy weather: Climate change drives demand for storm-resistant, bullet-proof cabins Virginia-based off-site construction company VFP specialises in producing bullet-proof concrete cabins which can withstand tornadoes with a rating of EF5 

The presence of a seasonal high-pressure La Ni帽a system is driving some of the irregularities for both continental regions, and the advice on both ends is to prepare for everything this winter.

鈥淏race yourself,鈥� says Merchants Fleet, a global and US-based vehicle fleet management firm, which offers products and solutions for construction machinery. 鈥淧reparing your fleet for winter is more than a routine check. It鈥檚 essential for keeping vehicles safe, efficient and ready for any weather.鈥�

Don鈥檛 skip the basics in prepping construction fleet for winter weather
Excavator works in snow (Image: Adobe Stock) An excavator works a snowy work site. (Image: Adobe Stock)

Merchants Fleet emphasises that winterising your fleet can make all the difference; from improving fuel efficiency to reducing unexpected downtime.

鈥淭o get your fleet winter-ready, start by checking that the coolant in each vehicle is topped off and has the appropriate freeze protection level, [and] replace the coolant if it鈥檚 insufficient or contaminated.

鈥淣ext, test vehicle batteries to ensure they鈥檙e equipped to handle cold weather starts and replace any that show signs of weakness to avoid breakdowns. Inspect air and fuel filters to confirm they鈥檙e clean and functioning optimally and replace any that are clogged or near the end of their service life.鈥�

Other handy advice for fleet managers and contractors from Merchant Fleets includes creating a 鈥渟torm profile鈥� for machines (which anticipates increased fuel needs during extreme weather), staying ahead of braking maintenance and restocking cabs with first aid supplies.

Working with tools in cold weather (Image: Adobe Stock) Workers use personal tools on a wintry construction site. Cold weather can increase risk of hand-arm vibration syndrome. (Image: Adobe Stock)

That last tip is confirmed by UK-based Glanville Training Academy (GTA), which provides health and safety awareness courses for the construction industry. GTA notes illness is up in winter, as are unique physical ailments that manifest more in cold temperatures.

鈥淐old stress is one potential hazard to the health of working in the winter and when the temperature falls near or below freezing, this can be severely dangerous to a person鈥檚 health with a risk of painful joints, fatigue, trench foot, frostbite, and hypothermia occurring if operatives aren鈥檛 protected from the elements of outside working,鈥� says GTA. 鈥淚n addition to an increased chance of illness as a result of the wet and cold temperatures, workers that use power tools such as concrete breaker plates and angle grinders increase their risk of HAVs (hand-arm vibration syndrome) during the colder months.

鈥淚t鈥檚 important that all workers using power tools are adequately trained on how to use their tools and a procedure is put in place to ensure their exposure is monitored and minimised.鈥�

Construction crews must have a plan for workers, equipment during weather events

US-based Victor Insurance notes several key processes supervisors and managers can employ to reduce risk on winter construction sites.

Workers in winter conditions (Image: Adobe Stock) Crews work at height in winter conditions. (Image: Adobe Stock)

The most important step may be the easiest: plan ahead.

鈥淩egularly check for weather updates,鈥� Victor suggests, 鈥淸and] complete a winter weather risk assessment to help determine the correct plan of action when winter weather approaches. This should include worker training and protection, material/equipment storage and protection, and clearing roads/walkways.鈥�

And don鈥檛 push it, adds Victor.

鈥淧repare for unexpected days off due to icy conditions, high winds or bad visibility. Consider alternative arrangements in advance such as weekend work that will help make up for lost time,鈥� says the insurance firm.

Majority of US supports stricter construction standards in extreme weather areas Americans said stricter building standards for new construction were a good idea to resist extreme weather caused by climate change

Other tips include finding heated storage for equipment and machines, bringing mobile heaters onsite, heating and insulating needed water piping and educating the workforce on safely working in colder conditions.

Victor adds, 鈥淐onsider breaking up individual workloads to limit worker exposure and physical exertion, provide workers with a heated break area where hot drinks are accessible, ensure workers are wearing protective clothing to help them stay warm鈥� [and]remove snow and ice from the jobsite everyday and consider applying grit to walkways to reduce the risk of slips, trips and falls.鈥�

US-based Kilgore Companies, a construction materials provider, notes that reduced daylight can also prove problematic to efficiency, and adjustments to the workday could be prudent.

鈥淲ith shorter daylight hours in fall, we may need to adjust our work hours to make the most of the available daylight. This might involve starting work earlier in the morning or extending shifts to cover more hours of daylight,鈥� says Kilgore.

Construction materials may be fussy
A snowy construction site (Image: Adobe Stock) A worker navigates a construction site covered in snow. (Image: Adobe Stock)

Kilgore adds that expectations for how construction materials behave must be adjusted, as well.

鈥淲e should also consider any changes to our construction methods or materials that might be required due to the seasonal conditions. For example, certain materials may perform differently in cooler temperatures, so we may need to make adjustments to our construction techniques or materials,鈥� the company says.

Victor Insurance notes some instances where this becomes a regular part of the day through the winter months.

鈥淐oncrete and masonry related work can take much longer and even fail if proper precautions are not taken,鈥� the company says. 鈥淚n order for concrete to reach necessary strength levels, it cannot be allowed to freeze during the first 24 hours after being poured or placed.

鈥淢ortar mix must be kept from freezing and at warm enough temperatures during the initial phases of installation to perform properly.鈥�

Climate neutrality a key topic at bauma 2025 E-machines and alternative drives will highlight industry鈥檚 decarbonization efforts
What COP29 could mean for construction CIOB President, Professor Mike Kagioglou, on what the recent COP29 summit means for the construction industry 

必赢体育

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Editor, Editorial, UK 鈥� Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]