Vinci to design and build �100m+ waste-to-energy plant in France

Vinci Construction’s Vinci Grands Projets arm is to lead the design and construction of a new household-waste-to-energy plant in France.

A digital render of how the new waste-to-energy facility will look Image: Vinci

The plant will replace an existing facility near Brive-la-Gaillarde in the department of Corrèze.

It will have a treatment capacity of almost 10 tonnes per hour (79,000 tonnes a year), which is equivalent to the annual waste produced by 200,000 residents.

The new plant, being constructed for Veolia, will upgrade the plant’s environmental efficiency by adding new processing systems, notably to treat flue gases.

The electricity and heat will be used by local industrial and community facilities.

±ØÓ®ÌåÓý

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Editor, Editorial, UK â€� Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]