Explosives bring down 3,800-tonne mining 鈥榤onster鈥�

Premium Content

RWE Power, part of energy company RWE Global, has used explosives to dismantle a rather unique, 3,800-tonne mining 鈥渟preader鈥�.

The blast flashpoint on the spreader machine (PHOTO: IMAGO/Beautiful Sports via Reuters Connect)


Originally designed and built as a lignite excavator in 1961 for the Garzweiler Opencast Mine in North Rhine-Westphalia, Germany, the 鈥渟preader鈥� was later adapted to operate as a mining materials stacker. 

A few years later, it was re-engineered again, to serve as a spreader at RWE鈥檚 nearby Hambach Opencast Mine.

After 42 years in 鈥榙iverse鈥� operation and finally at the end of its useful working life, the 47-metre-high, 148-metre-long contraption was recently taken down via an explosive event carried out at the Hambach mining site.

RWE used 300 charges, containing a total of around 27 kg of explosives, to bring down the machine, which through all its adaptions still retained its original excavator chassis.

EXCLUSIVE: Jet Demolition鈥檚 3 most difficult implosive projects Kate Bester details the complexities of taking down giant structures in the some of the world鈥檚 most populous cities 

必赢体育

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: andy.brown@khl.com
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: neil.gerrard@khl.com
Catrin Jones Editor, Editorial, UK 鈥� Wadhurst Tel: +44 (0) 791 2298 133 E-mail: catrin.jones@khl.com
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: eleanor.shefford@khl.com