Architect sought for high-speed rail hub in Czechia

Premium Content

The Czech rail infrastructure manager Spr谩va 啪eleznic (SZ) has begun the procedure to identify an architect to design the high-speed rail terminal in Jihlava, 130 km south-east of Prague. The winner of the competition will be announced in the first half of next year.

Illustration of proposed high-speed rail terminal in Jihlava Illustration of proposed high-speed rail terminal in Jihlava. Image: SZ

The terminal will provide connection to the fast rail services on the Prague 鈥� Brno route and will have a park and ride facility with connection to all public transport services.

The terminal will also be connected to the Jihlava 鈥� Havl铆膷k暖v Brod regional line and the adjacent D1 highway.

The competition calls for the design of a multi-storey terminal, in which the existing line will intersect with the future high-speed line.

The competition also includes a bridge over the D1 highway with a span of more than 160m and the development of an urban conceptual design which will offer a range of commercial opportunities around the terminal.

SZ says that the 鈥渆xperience from abroad shows that the vicinity of terminals on the outskirts of cities can experience rapid development in the coming years if there is a quality infrastructure connection.鈥�

Phased design model

The terminal in the Jihlava-P谩vov municipality is part of the new railway connection from Prague to Brno. It will be constructed on the prepared route Vyso膷ina phase II section between Sv臎tla nad S谩zavou and Velka B铆te拧.

Vyso膷ina high-speed line is divided into two phases. The first involves the construction of the Velk谩 B铆te拧 鈥� Brno section, the second then the construction of the Sv臎tl谩 nad S谩zavou 鈥� Velk谩 B铆te拧 section, thus, the entire Prague 鈥� Brno high-speed line will be completed.

Passenger trains will run at speeds of up to 320 km/h and will provide connections with the express and regional rail services. The 80-km Vyso膷ina phase II section should be built between 2029 and 2034.

The future Prague 鈥� Brno high speed rail will be extended to Ostrava and provide cross-border connection with Poland towards Katowice, as well as to B艡eclav (south of Brno) which will ensure the connection towards Austria (in Vienna) and Slovakia, in Bratislava.

The line between Prague and Brno will reduce travel time from three hours to 50 minutes and is expected to carry up to 60,000 passengers a day.

The high-speed rail terminal in Jihlava will be the third to be designed, after Prague East VRT and Roudnice nad Labem interchange hubs.

In August 2022, SZ awarded Rusina Frei architekti a contract for the design of Roudnice nad Labem interchange hub to be constructed on the Pod艡ipsko high-speed rail section linking Prague and Lovosice. This 60 km rail section will be constructed from 2027 and is expected to be completed in 2030.

必赢体育

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Catrin Jones Editor, Editorial, UK 鈥� Wadhurst Tel: +44 (0) 791 2298 133 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]